Design and construction of the Red Ruby Peninsula Resoort wastewater treatment system

Investor : RED RUBY PENINSULA CO., LTD.
Project location : At Dam Mon Hamlet, Van Thanh Ward, Van Ninh District, Khanh Hoa.
Capacity : Q = 150m³ / day night.
Technology applied : Biotechnology, standardized wastewater: QCVN 14: 2008 / NTNMT-National technical regulation on domestic wastewater quality level A.
Water source : Waste water generated in the resort.
Year of implementation : September 24, 2019
Implementation time : 90 days
Scope of work : Design, construction and installation of wastewater treatment system equipment